Returning a ship to a fully operational status from the dry dock is measured in milestones. USS Curtis Wilbur passed a major milestone in their maintenance cycle as Petty Officer Chris Henry reports.
Date Taken: | 11.27.2012 |
Date Posted: | 12.02.2012 13:57 |
Category: | Newscasts |
Audio ID: | 31469 |
Filename: | 1212/DOD_100657493.mp3 |
Length: | 00:00:56 |
Location: | JP |
Web Views: | 23 |
Downloads: | 1 |
High-Res. Downloads: | 0 |
This work, USS Curtis Wilbur Dry Dock Flooding, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.