Dr. Buddy Bartels, a research civil engineer at the U.S. Army Engineer Research and Development Center's (ERDC) Construction Engineering Research Laboratory, discusses projects that are enabling innovation for installations during a Feb, 26, 2021, episode of the Power of ERDC podcast. Topics include the changing nature of installations (4:55), as well as ERDC’s involvement in the Tyndall Air Force Base rebuild (10:00), the Virtual Testbed for Installation Mission Effectiveness project (11:23) and the overall Installations of the Future effort (18:49). The Power of ERDC podcast is a behind-the-scenes look at the ERDC’s involvement in solving some of the nation’s toughest engineering challenges.
Date Taken: | 02.26.2021 |
Date Posted: | 03.29.2021 10:53 |
Category: | Newscasts |
Audio ID: | 65556 |
Filename: | 2103/DOD_108216418.mp3 |
Length: | 00:29:23 |
Location: | VICKSBURG, MISSISSIPPI, US |
Web Views: | 18 |
Downloads: | 0 |
High-Res. Downloads: | 0 |
This work, Power of ERDC podcast Ep. #2: Installations of the Future, by Christopher Kieffer, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.