In the aftermath of the destruction left in the wake of Hurricane Michael in 2018, the Natural Disaster Recovery Division has been utilizing fast-paced contracting processes to acquire innovative technologies to rebuild Tyndall Air Force Base as an ‘Installation of the Future’.
Date Taken: | 05.31.2022 |
Date Posted: | 05.31.2022 09:57 |
Category: | Newscasts |
Audio ID: | 69372 |
Filename: | 2205/DOD_109028324.mp3 |
Length: | 00:33:17 |
Artist | Airman Magazine |
Year | 2022 |
Genre | Podcast |
Location: | FORT GEORGE G. MEADE, MARYLAND, US |
Web Views: | 72 |
Downloads: | 0 |
High-Res. Downloads: | 0 |
This work, The Debrief - Installation Proving Ground, by TSgt Janiqua Robinson, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.