Test flows from Fort Peck Dam to comply with the 2018 Biological Opinion were lowered to a target of 10,000 cfs (at Wolf Point) and start increasing around mid-June to reach 22,000 cfs. The test is required under the Endangered Species Act for operation of the Missouri River Mainstem Reservoir System. These weekly virtual meetings are aimed at updating the public on test progress, monitoring and planned operations.