Wright-Patterson Air Force Base's traffic flow has changed at Gate 22 of Area B. Effective February 10, 2025, Monday through Friday from 6 a.m. to 9 a.m.; incoming traffic will have an additional lane of entry and be required to stay in lanes to assist with entry. This graphic was designed on February 14, 2025. (U.S. Air Force graphic by Wilbur Wood)
Date Taken: | 02.14.2025 |
Published: | 03-11-25 12:27 PM |
Graphic ID: | 34563 |
VIRIN: | 250214-F-YC551-1001 |
Size: | 714.52 KB |
Location: | WRIGHT-PATTERSON AFB, OHIO, US |
Web Views: | 2 |
Downloads: | 0 |
This work, WPAFB Traffic Update - Gate 22B Traffic Flow, by Wilbur Wood, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.