Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Zinc anode replacement deep water mooring [Image 2 of 5]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Zinc anode replacement deep water mooring

    APRA HARBOR, GUAM

    03.28.2014

    Courtesy Photo

    Underwater Construction Team 2

    Builder 2nd Class (SCW/DV) Joseph Hophan, from Underwater Construction Team (UCT) Two replaces zinc anodes on a deep water mooring in Apra Harbor, Guam. Members of UCT 2 are in Guam conducting deep water mooring maintenance on their second of seven stops spanning six countries during their deployment across Pacific Fleet. They'll be conducting inspection, maintenance and repair of various underwater and waterfront facilities along with participation in four PACFLT exercises during their six-month PACOM deployment. (Photo by Equipment Operator 1st Class (SCW/DV) Manuel Terrero)

    IMAGE INFO

    Date Taken: 03.28.2014
    Date Posted: 05.02.2014 18:53
    Photo ID: 1310661
    VIRIN: 140328-N-ZZ999-001
    Resolution: 2800x2100
    Size: 1.39 MB
    Location: APRA HARBOR, GU

    Web Views: 143
    Downloads: 7

    PUBLIC DOMAIN