Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    KC-46A Pegasus construction continues [Image 2 of 4]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    KC-46A Pegasus construction continues

    MCCONNELL AIR FORCE BASE, KANSAS, UNITED STATES

    04.30.2015

    Photo by Staff Sgt. Rachel Waller 

    22nd Air Refueling Wing

    A wheel loader hauls an old pipe away from the KC-46A Pegasus hangar construction site April 30, 2015, at McConnell Air Force Base, Kan. Three hangars are being built to house the new aircraft and will have the capability of storing six KC-46As. Hangars 1124 and 1125 are scheduled for completion by the end of the year and Hangar 1126 is scheduled for completion in 2017. (U.S. Air Force photo by Staff Sgt. Rachel Waller)

    IMAGE INFO

    Date Taken: 04.30.2015
    Date Posted: 05.01.2015 17:06
    Photo ID: 1909500
    VIRIN: 150430-F-BX362-113
    Resolution: 3572x2288
    Size: 3.12 MB
    Location: MCCONNELL AIR FORCE BASE, KANSAS, US

    Web Views: 24
    Downloads: 3

    PUBLIC DOMAIN