A construction worker secures a piece of rebar to the floor of Hangar 1125, April 30, 2015, at McConnell Air Force Base, Kan. The rebar reinforces the concrete floor once it is poured. Hangar 1125 will be used for general maintenance on the KC-46A Pegasus once it is delivered to McConnell, which is scheduled to happen in August 2016. (U.S. Air Force photo by Staff Sgt. Rachel Waller)
Date Taken: | 04.30.2015 |
Date Posted: | 05.01.2015 17:06 |
Photo ID: | 1909504 |
VIRIN: | 150430-F-BX362-132 |
Resolution: | 3208x2068 |
Size: | 3.15 MB |
Location: | MCCONNELL AIR FORCE BASE, KANSAS, US |
Web Views: | 18 |
Downloads: | 2 |
This work, KC-46A Pegasus construction continues [Image 4 of 4], by MSgt Rachel Waller, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.