Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    KC-46A Pegasus construction continues [Image 4 of 4]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    KC-46A Pegasus construction continues

    MCCONNELL AIR FORCE BASE, KANSAS, UNITED STATES

    04.30.2015

    Photo by Staff Sgt. Rachel Waller 

    22nd Air Refueling Wing

    A construction worker secures a piece of rebar to the floor of Hangar 1125, April 30, 2015, at McConnell Air Force Base, Kan. The rebar reinforces the concrete floor once it is poured. Hangar 1125 will be used for general maintenance on the KC-46A Pegasus once it is delivered to McConnell, which is scheduled to happen in August 2016. (U.S. Air Force photo by Staff Sgt. Rachel Waller)

    IMAGE INFO

    Date Taken: 04.30.2015
    Date Posted: 05.01.2015 17:06
    Photo ID: 1909504
    VIRIN: 150430-F-BX362-132
    Resolution: 3208x2068
    Size: 3.15 MB
    Location: MCCONNELL AIR FORCE BASE, KANSAS, US

    Web Views: 18
    Downloads: 2

    PUBLIC DOMAIN