Staff Sgt. Justin Morrison, 90th Civil Engineer Squadron Pavements and Equipment, smooth’s out concrete poured outside the Chadwell Dining Facility on F.E. Warren Air Force Base, Wyo., Nov. 10, 2015. The concrete replaced gravel that pedestrians often kicked into the roads, posing wear and tear issues for the road. (U.S. Air Force photo by Senior Airman Jason Wiese)
Date Taken: | 11.10.2015 |
Date Posted: | 12.07.2015 14:15 |
Photo ID: | 2318559 |
VIRIN: | 151110-F-BR137-007 |
Resolution: | 3511x2332 |
Size: | 3.97 MB |
Location: | F.E. WARREN AIR FORCE BASE, WYOMING, US |
Web Views: | 11 |
Downloads: | 6 |
This work, Civil engineering projects: From beginning to end [Image 5 of 5], by SrA Jason Wiese, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.