Lt. Terence Taylor listens to a contractor as two new incinerators operate behind them. The PENNRAM step-down incinerators installed in the expansion area of Camp Lemonnier, Djibouti, became fully operational, April 1, replacing the existing incinerators and increasing the camp's ability to manage trash waste.
Date Taken: | 04.01.2010 |
Date Posted: | 04.07.2010 03:08 |
Photo ID: | 266585 |
VIRIN: | 100313-N-2221M-104 |
Resolution: | 2400x1597 |
Size: | 769.31 KB |
Location: | CAMP LEMONNIER, DJ |
Web Views: | 261 |
Downloads: | 9 |
This work, New Incinerators Operating on Camp Lemonnier, by CPO Frank Montellano, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.