Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    The aircraft carrier USS George H.W. Bush (CVN 77). GHWB is currently conducting Tailored Ship's Training Availability and Final Evaluation Problem (TSTA/FEP). TSTA prepares the ship and crew for full integration into a carrier strike group through a wide [Image 4 of 328]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    The aircraft carrier USS George H.W. Bush (CVN 77). GHWB is currently conducting Tailored Ship's Training Availability and Final Evaluation Problem (TSTA/FEP). TSTA prepares the ship and crew for full integration into a carrier strike group through a wide

    USS GEORGE H.W. BUSH, N/A, UNITED STATES

    09.17.2016

    Photo by Petty Officer 3rd Class Kayla Cosby 

    U.S. Navy           

    160917-N-VK873-012 ATLANTIC OCEAN (Sept. 17, 2016) Aviation Structural Mechanic 3rd Class Kristina Bodden conducts maintenance on an MH-60S Sea Hawk helicopter attached to the "Tridents" of Helicopter Sea Combat Squadron (HSC) 9 aboard the aircraft carrier USS George H.W. Bush (CVN 77). GHWB is currently conducting Tailored Ship's Training Availability and Final Evaluation Problem (TSTA/FEP). TSTA prepares the ship and crew for full integration into a carrier strike group through a wide range of mission-critical operations. (U.S. Navy photo by Mass Communication Specialist 3rd Class Kayla King/Released)

    IMAGE INFO

    Date Taken: 09.17.2016
    Date Posted: 09.23.2016 00:00
    Photo ID: 2873895
    VIRIN: 160917-N-VK873-015
    Resolution: 4221x2788
    Size: 895.28 KB
    Location: USS GEORGE H.W. BUSH, N/A, US

    Web Views: 5
    Downloads: 9

    PUBLIC DOMAIN