(left to right)Allen Terrell of HNTB-Halff Joint Venture Engineering Services, Mike Fallon of HNTB-Halff Joint Venture Engineering Services, Michael Todd Smith, director, USACE, Southwestern Division, Engineering and Construction Support Office, Keith Flossman, program manager USACE, Southwestern Division, Engineering and Construction Support Office, Matthew Shun , project manager, USACE, Los Angeles District, Ann Erin Mercer, project manager CBP, Zachary Evans, chief of facilities CBP, Loren Flossman, director BPAMO, unknown identified, Maj. Stambersky, deputy chief of contracting, USACE, Los Angeles District ceremonially turned dirt for the start of the $11 million project that calls for the construction of a 22,000 square foot facility located adjacent to the AMOC on MARB.
U.S. Army Corps of Engineers Los Angeles District, U.S. Customs and Border Protection Air and Marine Operations and March Air Reserve Base officials broke ground, on a new CBP Air and Marine Operations Center expansion construction project here, Oct. 26.
Date Taken: | 10.25.2016 |
Date Posted: | 10.28.2016 18:16 |
Photo ID: | 2953257 |
VIRIN: | 161026-A-AB280-034 |
Resolution: | 3300x2550 |
Size: | 2.29 MB |
Location: | MARCH AIR RESERVE BASE, CALIFORNIA, US |
Web Views: | 102 |
Downloads: | 4 |
This work, Corps and CBP break ground on AMOC construction project [Image 5 of 5], by Brooks Hubbard IV, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.