Christian Kampa, 786th Civil Engineer Squadron structural maintainer, dumps old mortar into a bin while doing maintenance work at the aquatic center on Ramstein Air Base, Germany, Dec. 15, 2016. Maintenance work included replacing old tiles in the pools, redoing grout work, and replacing old slides in the children’s area. (U.S. Air Force photo Airman 1st Class Joshua Magbanua)
Date Taken: | 12.15.2016 |
Date Posted: | 01.03.2017 03:07 |
Photo ID: | 3079973 |
VIRIN: | 161215-F-ZF730-155 |
Resolution: | 3696x2456 |
Size: | 1.74 MB |
Location: | RAMSTEIN AIR BASE, RHEINLAND-PFALZ, DE |
Web Views: | 14 |
Downloads: | 3 |
This work, Diving into the New Year: Ramstein Aquatic Center soon to reopen [Image 3 of 3], by SSgt Joshua Joseph Magbanua, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.