Col. Craig Johnson, 96th Civil Engineer Group commander, speaks to the crowd gathered for a small ‘first installation’ ceremony of the 240-acre solar array Jan. 18 at Eglin Air Force Base, Fla. Leaders from the three project partners, Air Force, Gulf Power and Coronal Development Services, installed the first of the eventual 375,000 solar panels that will be located on the 240-acre site. (U.S. Air Force photo/Samuel King Jr.)
Date Taken: | 01.18.2017 |
Date Posted: | 01.20.2017 14:22 |
Photo ID: | 3110146 |
VIRIN: | 170118-F-oc707-601 |
Resolution: | 3000x1971 |
Size: | 2.78 MB |
Location: | EGLIN AIR FORCE BASE, FLORIDA, US |
Web Views: | 16 |
Downloads: | 5 |
This work, First panel installed at Eglin’s solar farm [Image 6 of 6], by Samuel King Jr., identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.