From left to right: retired Fire Chief Thomas C. Mylett, Chief Kenneth R. Lavoie, Fitz Chavis, Cherry Point’s commanding officer Col. Philip J. Zimmerman, Lt. Col. Brian E. Kuhn, Maj. Terrence Fox, Chris Newton and Assistant Chief James P. Johnson officially break ground at the new fire station facility location Jan. 5. The new facility will replace Fire Station 4 in the Lanham housing area and bring the fire station up to modern standards.
Date Taken: | 01.05.2011 |
Date Posted: | 01.21.2011 09:12 |
Photo ID: | 359558 |
VIRIN: | 110105-M-5623T-022 |
Resolution: | 3504x2336 |
Size: | 4.7 MB |
Location: | MARINE CORPS AIR STATION CHERRY POINT, NORTH CAROLINA, US |
Web Views: | 86 |
Downloads: | 2 |
This work, New Cherry Point fire station under construction, by Cpl Scott L. Tomaszycki, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.