U.S. Air Force Senior Airman Hunter Jerome, 577th Expeditionary Prime Base Engineer Emergency Force Group electrical power production, drives an all terrain forklift on Kandahar Airfield, Afghanistan, Dec. 27, 2017. The matting will be used to house aircraft on the flightline. The efforts at Kandahar Airfield are in support of the new campaign in Afghanistan (U.S. Air Force photo by Staff Sgt. Sean Martin)
Date Taken: | 12.28.2017 |
Date Posted: | 11.18.2019 03:13 |
Photo ID: | 4054620 |
VIRIN: | 171228-F-SR682-0053 |
Resolution: | 5299x3239 |
Size: | 2.78 MB |
Location: | KANDAHAR AIRFIELD, AF |
Web Views: | 17 |
Downloads: | 0 |
This work, Kandahar Airfield Hanger Construction [Image 7 of 7], by SSgt Sean Martin, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.