Col. Daniel Patton talks to contractors after the first completed facility constructed was officially viewed in Joplin, Mo., July 1, 2011. The U.S. Army Corps of Engineers oversaw construction of the facilities as part of its mission to provide temporary replacements for critical public infrastructure like schools and fire stations after an F-5 tornado caused widespread destruction in the Joplin area May 22. Fire Station 2 was completed six days ahead of schedule July 1.
Date Taken: | 07.01.2011 |
Date Posted: | 07.01.2011 21:24 |
Photo ID: | 423076 |
VIRIN: | 110701-A-LI404-072 |
Resolution: | 4288x2848 |
Size: | 5.75 MB |
Location: | JOPLIN, MISSOURI, US |
Web Views: | 36 |
Downloads: | 2 |
This work, Joplin Fire Station 2 [Image 3 of 3], by Chris Gray, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.