A series of power lines and substation connected to the Kajaki dam’s hydroelectric powerplant. The U.S. Army Corps of Engineers’ Afghanistan Engineer District-South and Afghan engineers recently completed installation of a primary switch center at the Kajaki dam to resolve electrical problems.
Date Taken: | 07.11.2011 |
Date Posted: | 07.14.2011 06:08 |
Photo ID: | 427479 |
VIRIN: | 110711-N-TH989-192 |
Resolution: | 2784x1848 |
Size: | 2.18 MB |
Location: | KAJAKI, AF |
Web Views: | 181 |
Downloads: | 11 |
This work, Improvements to Kajaki dam power potential in southern Afghanistan [Image 5 of 5], by PO2 Jonathan David Chandler, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.