Soldiers of the 569th Engineer Dive Detachment, located in Fort Eustis, Va., excavate a bridging site in preparation for the Wet Gap Crossing at River Assault 2011 July 25, 2011, at Fort Chaffee, Ark. River Assault culminated with the construction of a floating improved ribbon bridge across the Arkansas River.
Date Taken: | 07.25.2011 |
Date Posted: | 07.28.2011 23:19 |
Photo ID: | 435920 |
VIRIN: | 110725-A-XG955-002 |
Resolution: | 3253x2592 |
Size: | 5.09 MB |
Location: | FORT CHAFFEE, ARKANSAS, US |
Web Views: | 153 |
Downloads: | 23 |
This work, River Assault bridge crossing [Image 27 of 27], by SPC Brittney Bradley, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.