Diagram of Public Viewing Designated Area at Kentucky Dam of placement of a 1.3-million-pound concrete shell Friday, Aug. 3, 2018 that will form a part of the downstream cofferdam for the new lock under construction at Kentucky Dam, a Tennessee Valley Authority project. Lifting and setting this massive concrete shell represents a critical milestone towards completion of the new 1,200-foot-long navigation lock and involves techniques never previously attempted. This placement is part of the U.S. Army Corps of Engineers Nashville District's Kentucky Lock Addition Project. (Photo by Courtesy Asset)
Date Taken: | 08.01.2018 |
Date Posted: | 08.01.2018 14:13 |
Photo ID: | 4607215 |
VIRIN: | 180801-A-CE999-1050 |
Resolution: | 865x644 |
Size: | 461.66 KB |
Location: | GRAND RIVERS, KENTUCKY, US |
Web Views: | 46 |
Downloads: | 4 |
This work, Kentucky Lock’s first lift-in shell to be placed, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.