Construction and steel repair work on the Bourne Bridge over the Cape Cod Canal in Massachusetts is performed above the road deck. This construction lead to lane restrictions, which ended Dec. 16, opening the bridge back up to four lanes before the busy holiday season. Steel repair work will continue below the road deck on the Bourne Bridge until the fall of 2012. Work on the Sagamore Bridge will begin after winter and continue through the fall of 2012. Temporary lane restrictions, reduced to one lane in each direction, will be put into place in the spring of 2012 for about 4-6 weeks to perform the above deck work on the Sagamore Bridge. (John MacPherson/U.S. Army photo)
Date Taken: | 11.21.2011 |
Date Posted: | 12.30.2011 12:57 |
Photo ID: | 504867 |
VIRIN: | 111121-A-CE999-021 |
Resolution: | 640x480 |
Size: | 240.91 KB |
Location: | BOURNE, MASSACHUSETTS, US |
Web Views: | 65 |
Downloads: | 0 |
This work, All traffic lanes open on the Bourne Bridge, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.