Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Bringing innovation to fruition: Marines 3D print 1st reinforced concrete bridge in western hemisphere

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Bringing innovation to fruition: Marines 3D print 1st reinforced concrete bridge in western hemisphere

    CAMP PENDLETON, CALIFORNIA, UNITED STATES

    12.13.2018

    Courtesy Photo

    Marine Corps Systems Command

    A Marine with 1st Marine Logistics Group walks across a concrete footbridge during a 3D concrete printing exercise Dec. 12, at Camp Pendleton, California. Working with Marine Corps Systems Command’s Advanced Manufacturing Operations Cell and the Army Corps of Engineers, the 1st MLG used the Automated Construction of Expeditionary Structures—or ACES—printer to conduct 3D concrete printing of the bridge and evaluate emerging technology for future application in Marine Corps engineering operations. (U.S. Navy photo by Ensign Elizabeth Flanary)

    IMAGE INFO

    Date Taken: 12.13.2018
    Date Posted: 02.08.2019 18:11
    Photo ID: 5062747
    VIRIN: 181212-M-ZZ999-0433
    Resolution: 1200x800
    Size: 978.96 KB
    Location: CAMP PENDLETON, CALIFORNIA, US

    Web Views: 109
    Downloads: 13

    PUBLIC DOMAIN