Timothy Stewart, U.S. Army Corps of Engineers Regional Rivers Repair Fleet machinist, drills and caps the keeper plates and retaining pins on the tensioning bolts of the Black Rock Lock gates in Buffalo, NY, March 20, 2020.
The team working on the Black Rock Lock gate repair project is the Medium Capacity Regional Rivers Repair Fleet. USACE also deploys a Light and Heavy fleet which is determined by the team's largest crane size.