Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Engineers Measure Depth of New River Channel Following Michigan Dam Failure [Image 4 of 24]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Engineers Measure Depth of New River Channel Following Michigan Dam Failure

    MIDLAND, MICHIGAN, UNITED STATES

    05.28.2020

    Photo by Bobby Petty   

    U.S. Army Corps of Engineers, Detroit District

    From left, Detroit District Hydraulic Engineer Matt McClerren, Geographer Derek Cusimano and Senior Hydraulic Engineer Chris Warren prepare to deploy a “Z-Boat” to measure the depth of the new Tittabawassee River channel May 27, 2020. The new river channel was created May 19, 2020, following the Edenville Dam failure. The U.S. Army Corps of Engineers is providing dam assessment and inundation modeling to the State of Michigan.

    IMAGE INFO

    Date Taken: 05.28.2020
    Date Posted: 06.09.2020 23:26
    Photo ID: 6236376
    VIRIN: 200528-O-QH057-029
    Resolution: 6000x4000
    Size: 13.45 MB
    Location: MIDLAND, MICHIGAN, US

    Web Views: 142
    Downloads: 2

    PUBLIC DOMAIN