Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Engineers Measure Depth of New River Channel Following Michigan Dam Failure [Image 8 of 24]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Engineers Measure Depth of New River Channel Following Michigan Dam Failure

    MIDLAND, MICHIGAN, UNITED STATES

    05.27.2020

    Photo by Bobby Petty   

    U.S. Army Corps of Engineers, Detroit District

    From left, Detroit District Geographer Derek Cusimano, Senior Hydraulic Engineer Chris Warren and Hydraulic Engineer Matt McClerren prepare to deploy a “Z-Boat” to measure the depth of the new Tittabawassee River channel May 27, 2020. The new river channel was created May 19, 2020, following the Edenville Dam failure. The U.S. Army Corps of Engineers is providing dam assessment and inundation modeling to the State of Michigan.

    IMAGE INFO

    Date Taken: 05.27.2020
    Date Posted: 06.09.2020 23:26
    Photo ID: 6236380
    VIRIN: 200527-O-QH057-753
    Resolution: 4032x3024
    Size: 6.11 MB
    Location: MIDLAND, MICHIGAN, US

    Web Views: 46
    Downloads: 4

    PUBLIC DOMAIN