Contractors with Ideker Inc. discuss levee repairs on top of the Wakenda Levee in Carroll County, Mo., Feb. 1, 2012. The levee was damaged during the Missouri River flooding in 2011. The contract was awarded by the U.S. Army Corps of Engineers Kansas City District, Jan. 23, 2012. A new drainage ditch was excavated and the new portion of the levee was setback.
Date Taken: | 02.01.2012 |
Date Posted: | 08.28.2012 14:33 |
Photo ID: | 653264 |
VIRIN: | 120201-A-FA287-044 |
Resolution: | 864x576 |
Size: | 398.9 KB |
Location: | CARROLL COUNTY, MISSOURI, US |
Web Views: | 27 |
Downloads: | 4 |
This work, Level of protection restored, by Diana McCoy, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.