Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Building the frame [Image 4 of 6]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Building the frame

    HOHENFELS, GERMANY

    06.03.2021

    Photo by Master Sgt. Ryan Matson 

    7th Army Training Command

    Spc. Kevin Beccarra, a horizontal construction engineer with third platoon, Argonaut Troop, Regimental Engineer Squadron, 2nd Cavalry Regiment, drills a wood screw into the frame of a 100-meter trench on Hohenfels Training Area, Hohenfels, Germany, June 3, 2021. The trench will be utilized for a number of training events throughout the year, beginning with the European Best Sniper Competition Aug. 5-14 on HTA. (U.S. Army photo by Master Sgt. Ryan C. Matson)

    IMAGE INFO

    Date Taken: 06.03.2021
    Date Posted: 07.16.2021 11:41
    Photo ID: 6727534
    VIRIN: 210603-A-LD390-865
    Resolution: 2000x3000
    Size: 4.07 MB
    Location: HOHENFELS, DE

    Web Views: 20
    Downloads: 8

    PUBLIC DOMAIN