U.S. Army Corps of Engineers Resident Engineer Will Adcock, second from the right, looks over site plans for Wiesbaden Middle School during its construction in April 2018 with then U.S. Army Corps of Engineers Director of Military Programs Lloyd Caldwell, far right, and others. Wiesbaden Middle School was the second of three schools constructed together in a campus, which the site plans partially show. The new schools were part of an overhaul of Department of Defense Education Activity schools at U.S. Army Garrison Wiesbaden in Germany that had dated to the 1950s. (U.S. Army photo by Lori Egan)
Date Taken: | 04.20.2018 |
Date Posted: | 11.24.2021 09:15 |
Photo ID: | 6954307 |
VIRIN: | 180401-A-WY320-0001 |
Resolution: | 1800x1202 |
Size: | 1.62 MB |
Location: | WIESBADEN, HESSEN, DE |
Web Views: | 15 |
Downloads: | 3 |
This work, Elementary school marks completion of full DoDEA campus for USAG Wiesbaden students [Image 5 of 5], by Lori Egan, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.