U.S. Army Corps of Engineers Project Manager Sibylle Ballnath points out features of the under-construction Wiesbaden Middle School to then U.S. Army Corps of Engineers Commander Lt. Gen Todd Semonite during a site visit in November 2018. Wiesbaden Middle School was the second of three schools constructed together in a campus as part of an overhaul of Department of Defense Education Activity schools at U.S. Army Garrison Wiesbaden in Germany that had dated to the 1950s. (U.S. Army photo by Lori Egan)
Date Taken: | 11.27.2017 |
Date Posted: | 11.24.2021 09:15 |
Photo ID: | 6954312 |
VIRIN: | 171127-A-WY320-911 |
Resolution: | 1200x1800 |
Size: | 1.69 MB |
Location: | WIESBADEN, HESSEN, DE |
Web Views: | 20 |
Downloads: | 2 |
This work, Elementary school marks completion of full DoDEA campus for USAG Wiesbaden students [Image 5 of 5], by Christopher Gardner, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.