Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    McCook Reservoir and McCook Levee [Image 1 of 9]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    McCook Reservoir and McCook Levee

    CHICAGO, ILLINOIS, UNITED STATES

    12.13.2020

    Courtesy Photo

    U.S. Army Corps of Engineers, Chicago District

    U.S. Army Corps of Engineers, Chicago District Commander COL Paul Culberson along with U.S. Congresswomen Marie Newman and the Metropolitan Water Reclamation District of Greater Chicago toured the McCook Reservoir and McCook Levee, 13 December 2021. (photo credit: Patrick Thomas, Metropolitan Water Reclamation District of Greater Chicago public affairs)

    Stage 1 of the McCook Reservoir, with a flood storage of 3.5 billion gallons, was completed on 31 December 2017; and stage 2 of the reservoir, with a storage volume of 6.5 billion gallons, is scheduled to be completed in 2029. The work is being completed by MWRD, with construction oversite of the USACE. McCook Levee construction was completed in the fall of 2020 and included restoring the levee system to a proper elevation, removing invasive species, and improving the infrastructure of the system.

    IMAGE INFO

    Date Taken: 12.13.2020
    Date Posted: 12.17.2021 10:07
    Photo ID: 6984983
    VIRIN: 201213-A-A1409-006
    Resolution: 6474x4247
    Size: 4.23 MB
    Location: CHICAGO, ILLINOIS, US

    Web Views: 17
    Downloads: 2

    PUBLIC DOMAIN