U.S. Army Corps of Engineers, North Atlantic Division Commander Brig. Gen. Thomas Tickner, U.S. Army Corps of Engineers Commander Lt. Gen. Scott Spellmon and Europe District Senior Project Engineer James O’Riley discuss progress on one of the many humidity-controlled warehouses being built as part of the Army Prepositioned Stock facilities being constructed in Powidz, Poland March 17, 2022. The APS facility, largely funded by NATO, involves the construction of roughly 650,000 square feet of humidity-controlled warehouse space, a vehicle maintenance facility and several additional supporting facilities and will contribute to the ability to rapidly deploy forces if needed to reassure allies and deter aggression. (U.S. Army photo by Chris Gardner)
Date Taken: | 03.17.2022 |
Date Posted: | 03.30.2022 05:03 |
Photo ID: | 7111382 |
VIRIN: | 220317-A-WZ074-3193 |
Resolution: | 6016x4016 |
Size: | 14.06 MB |
Location: | POWIDZ, PL |
Web Views: | 89 |
Downloads: | 7 |
This work, U.S. Army Corps of Engineers construction project in Poland will further enhance NATO readiness in region [Image 11 of 11], by Christopher Gardner, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.