Constructing the forms for the foundation of the 15-Foot Spin Tunnel. Charles Zimmerman was given the assignment to design and build a larger spin tunnel that would supplant the 5-foot Vertical Wind Tunnel. Authorization to build the tunnel using funds from the Federal Public Works Administration (PWA) came in June 1933. Construction started in late winter 1934 and the tunnel was operational in April 1935. The initial construction costs were $64,000. The first step was to pour the foundation for the tunnel and the housing which would encase the wind tunnel.