The old miter gates, weighing approximately 300 tons each, at Cannelton Locks and Dam in Cannelton, Ind., were removed at the end of July marking a milestone in the five-month endeavor.
Date Taken: | 07.23.2022 |
Date Posted: | 08.12.2022 08:52 |
Photo ID: | 7366396 |
VIRIN: | 220723-A-A1409-001 |
Resolution: | 801x718 |
Size: | 178.3 KB |
Location: | CANNELTON, INDIANA, US |
Web Views: | 19 |
Downloads: | 6 |
This work, Miter Gate Replacement Project underway at Cannelton Locks and Dam, by Abby Korfhage, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.