Kittery, ME (April 12, 2022) – Water surface elevation approaches the top of the caisson that sits in the P-310 Superflood Basin’s entrance structure as pumping into the Basin concludes. (U.S. Navy photo by Jim Cleveland/Released)
Date Taken: | 04.12.2022 |
Date Posted: | 08.24.2022 15:06 |
Photo ID: | 7386386 |
VIRIN: | 220412-N-LI217-606 |
Resolution: | 3000x2400 |
Size: | 2.15 MB |
Location: | KITTERY, MAINE, US |
Web Views: | 187 |
Downloads: | 8 |
This work, Superflood Elevation Reached [Image 7 of 7], by LT Matthew Karny, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.