NORFOLK, Virginia (October 6, 2022) USS Gravely (DDG 107) returns to port after a successful sea trials officially ending its three-month Selected Restricted Availability (SRA). Mid-Atlantic Regional Maintenance Center (MARMC), working with Marine Hydraulics International (MHI), delivered the Arleigh Burke guided-missile destroyer to the fleet six days ahead of schedule. MARMC provides surface ship maintenance, management and oversight of private sector maintenance and fleet technical assistance to ships in the Mid-Atlantic region. (U.S. Navy Photo by Danielle Lofton/Released).
Date Taken: | 10.06.2022 |
Date Posted: | 10.27.2022 14:08 |
Photo ID: | 7483089 |
VIRIN: | 221006-N-HD161-7072 |
Resolution: | 2048x1365 |
Size: | 619.02 KB |
Location: | NORFOLK, VIRGINIA, US |
Web Views: | 109 |
Downloads: | 19 |
This work, USS Gravely Completes Availability Ahead of Schedule, by Danielle Lofton, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.