Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Seabees and Marines, finishes concrete as part of the Malakal Harbor Improvements Project. [Image 4 of 4]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Seabees and Marines, finishes concrete as part of the Malakal Harbor Improvements Project.

    Malakal, Palau (Oct 18, 2022) Utilitiesman 3rd Class Ryan Rylie (left) with Naval Mobile Construction Battalion (NMCB) 4 and Lance Cpl. Armando Gorosavevacio (right) with 7th Engineering Support Battalion (ESB), finishes concrete in accordance with blueprints as part of the Malakal Harbor Improvements Project. This project will provide a new concrete cap as well as a new fender system to Palau’s sole commercial port. NMCB-4 is forward deployed throughout the Indo-Pacific region and United States territories to support and maintain a free and open Indo-Pacific. As the stand in, crisis response, naval engineering force, NMCB-4 maintains a ready posture to deliver in-theater expeditionary logistics via expeditionary shore infrastructure, forward damage repair, and mobile construction. (U.S. Navy photo by Steelworker Chief Jordan Waite/Released)

    IMAGE INFO

    Date Taken: 10.18.2022
    Date Posted: 11.23.2022 11:41
    Photo ID: 7523777
    VIRIN: 221018-N-QI626-0050
    Resolution: 1200x1600
    Size: 615.35 KB
    Location: MH

    Web Views: 40
    Downloads: 8

    PUBLIC DOMAIN