Malakal, Palau (Oct 18, 2022) Utilitiesman 3rd Class Ryan Rylie (left) with Naval Mobile Construction Battalion (NMCB) 4 and Lance Cpl. Armando Gorosavevacio (right) with 7th Engineering Support Battalion (ESB), finishes concrete in accordance with blueprints as part of the Malakal Harbor Improvements Project. This project will provide a new concrete cap as well as a new fender system to Palau’s sole commercial port. NMCB-4 is forward deployed throughout the Indo-Pacific region and United States territories to support and maintain a free and open Indo-Pacific. As the stand in, crisis response, naval engineering force, NMCB-4 maintains a ready posture to deliver in-theater expeditionary logistics via expeditionary shore infrastructure, forward damage repair, and mobile construction. (U.S. Navy photo by Steelworker Chief Jordan Waite/Released)
Date Taken: | 10.18.2022 |
Date Posted: | 11.23.2022 11:41 |
Photo ID: | 7523777 |
VIRIN: | 221018-N-QI626-0050 |
Resolution: | 1200x1600 |
Size: | 615.35 KB |
Location: | MH |
Web Views: | 40 |
Downloads: | 8 |
This work, Seabees and Marines, finishes concrete as part of the Malakal Harbor Improvements Project. [Image 4 of 4], by PO2 Amanda Hartjes, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.