Photo showing the overgrowth of invasive species along the banks of Lake Ballinger, in the city of Mountlake Terrace, Washington. The $55 million aquatic ecosystem restoration project, awarded to Tunista Corporation LLC of Federal Way, Washington, will remove invasive species, restore wetlands, riparian corridors and wildlife habitat within Ballinger Park.
Date Taken: | 01.06.2023 |
Date Posted: | 01.11.2023 12:00 |
Photo ID: | 7580781 |
VIRIN: | 230106-A-VA654-052 |
Resolution: | 4608x3456 |
Size: | 4.82 MB |
Location: | MOUNTLAKE TERRACE, WASHINGTON, US |
Web Views: | 8 |
Downloads: | 3 |
This work, Corps awards $5.5 million contract toward Mountlake Terrace Lake Ballinger aquatic ecosystem restoration project [Image 8 of 8], by Nicole Celestine, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.