The engineers of 814th Multi-Role Bridge Company (MRBC) construct the second floating span of a Mabey Johnson Float Bridge in the Al Anbar province, Jan. 25. With the continued emphasis on reducing coalition force impact to the local Iraqi population, 30th Naval Construction Regiment (NCR) (Forward) coordinated emplacement of the bridge as a replacement to the Tactical Assault Float Bridge that has been deployed at this site for nearly a year. The 30th NCR (Fwd) directs more than 1,400 Sailors, Marines and Soldiers supporting critical construction efforts in the Al Anbar province of Iraq, providing responsive military construction support to U.S. military and coalition operations. (U.S. Navy photo/Lt. Wade Horton)
Date Taken: | 01.25.2008 |
Date Posted: | 09.04.2011 07:45 |
Photo ID: | 76426 |
VIRIN: | 080125-N-4516H-794 |
Resolution: | 1800x1200 |
Size: | 1.21 MB |
Location: | AL ANBAR PROVINCE, IQ |
Web Views: | 462 |
Downloads: | 80 |
This work, Army Engineers and Navy Seabees Work In Partnership On A New Bridge, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.