Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Corps of Engineers reroutes Wild Rice River through structure

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Corps of Engineers reroutes Wild Rice River through structure

    HORACE, NORTH DAKOTA, UNITED STATES

    03.31.2023

    Photo by Elizabeth Stoeckmann 

    U.S. Army Corps of Engineers, St. Paul District

    The U.S. Army Corps of Engineers, St. Paul District, reroutes the Wild Rice River through the Wild Rice River Structure March 31 at 7:30 a.m.

    Rerouting the Wild Rice River will be a major milestone for the Fargo, North Dakota/Moorhead, Minnesota Flood Risk Management Project. After three years of construction, Ames Construction, Inc., will permanently divert the Wild Rice River through a gated concrete structure, a project first. This reroute will allow Ames to complete construction of a dam embankment across the existing Wild Rice River channel.

    IMAGE INFO

    Date Taken: 03.31.2023
    Date Posted: 06.13.2023 15:26
    Photo ID: 7858189
    VIRIN: 230331-A-AP582-020
    Resolution: 6960x4640
    Size: 7.39 MB
    Location: HORACE, NORTH DAKOTA, US

    Web Views: 13
    Downloads: 2

    PUBLIC DOMAIN