USACE Infrastructure Assessment team members who are mission assigned by FEMA, supported the State of Vermont by assessing the damage to wastewater treatment plants. The USACE team will then provide FEMA and the state of Vermont with the assessment reports and recommendations for necessary repairs to restore operations at the treatment plants.
Date Taken: | 07.18.2023 |
Date Posted: | 07.24.2023 13:31 |
Photo ID: | 7930659 |
VIRIN: | 230718-A-WY275-1008 |
Resolution: | 6192x4128 |
Size: | 5.42 MB |
Location: | CONCORD, MASSACHUSETTS, US |
Web Views: | 12 |
Downloads: | 3 |
This work, USACE Infrastructure Assessment team assesses damage to wastewater treatment plants in Vermont [Image 8 of 8], by Linnea Shirley, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.