Rock sockets like these need to be bored out during the pier drilling process to reach the proper depth for maximum strength.
Date Taken: | 07.12.2023 |
Date Posted: | 09.22.2023 11:50 |
Photo ID: | 8036606 |
VIRIN: | 230712-A-GI410-1022 |
Resolution: | 3000x1991 |
Size: | 2.51 MB |
Location: | LOUISVILLE, KENTUCKY, US |
Web Views: | 8 |
Downloads: | 1 |
This work, Louisville VAMC project reaches “bottoming out” milestone, by Michael Maddox, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.