All dredged material from the Baltimore Harbor and Channels will be removed via clamshell dredge and transported by barge to the respective placement sites. The material being removed consists primarily of mud, silt, sand, shell, and mixtures thereof.
Date Taken: | 12.20.2023 |
Date Posted: | 12.20.2023 10:26 |
Photo ID: | 8176504 |
VIRIN: | 231220-O-ZP796-3276 |
Resolution: | 5184x3456 |
Size: | 5.81 MB |
Location: | BALTIMORE, MARYLAND, US |
Web Views: | 51 |
Downloads: | 3 |
This work, Corps of Engineers to complete $29 million in Baltimore Harbor and Channels dredging, by Cynthia Mitchell, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.