Michael Shaughnessy, USACE Chicago Harbor Lock Lead Construction Control Representative, observes construction at the lock as the crew submerges material in the water for divers to arrange on the lock floor.
Date Taken: | 12.20.2023 |
Date Posted: | 12.27.2023 16:14 |
Photo ID: | 8182034 |
VIRIN: | 231220-O-JV047-4516 |
Resolution: | 1620x1080 |
Size: | 282.81 KB |
Location: | CHICAGO, ILLINOIS, US |
Web Views: | 27 |
Downloads: | 3 |
This work, Michael Shaughnessy, USACE Chicago Harbor Lock Lead Construction Control Representative observes construction at the lock [Image 6 of 6], by Emily Helton, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.