Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Michael Shaughnessy, USACE Chicago Harbor Lock Lead Construction Control Representative observes construction at the lock [Image 4 of 6]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Michael Shaughnessy, USACE Chicago Harbor Lock Lead Construction Control Representative observes construction at the lock

    CHICAGO, ILLINOIS, UNITED STATES

    12.20.2023

    Photo by Emily Helton 

    U.S. Army Corps of Engineers, Chicago District

    Michael Shaughnessy, USACE Chicago Harbor Lock Lead Construction Control Representative, observes construction at the lock as the crew submerges material in the water for divers to arrange on the lock floor.

    IMAGE INFO

    Date Taken: 12.20.2023
    Date Posted: 12.27.2023 16:14
    Photo ID: 8182034
    VIRIN: 231220-O-JV047-4516
    Resolution: 1620x1080
    Size: 282.81 KB
    Location: CHICAGO, ILLINOIS, US

    Web Views: 27
    Downloads: 3

    PUBLIC DOMAIN