A contractor prepares to sign the final support beam for Hangar One during the topping-out ceremony at Tyndall Air Force Base, Florida, March 13, 2024. Individuals across the installation were given the opportunity to sign the beam before being placed into the facility. (U.S. Air Force photo by Venessa Armenta)
Date Taken: | 03.13.2024 |
Date Posted: | 03.15.2024 17:08 |
Photo ID: | 8291660 |
VIRIN: | 240313-F-NF392-1004 |
Resolution: | 7799x5199 |
Size: | 4.84 MB |
Location: | TYNDALL AIR FORCE BASE, FLORIDA, US |
Web Views: | 26 |
Downloads: | 2 |
This work, Building up and topping out Hangar One [Image 9 of 9], by Venessa Armenta, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.