U.S. Coast Guard Unified Command demolition crews begin cutting the top portion of the north side of the collapsed bridge into smaller sections for safe removal by crane in the Patapsco River in Baltimore, March 30, 2024. Salvage teams use exothermic cutting torch to systematically separate sections of the steel bridge, which will be taken to a disposal site. (Key Bridge Response 2024 Unified Command photo by U.S. Coast Guard Petty Officer 2nd Class Taylor Bacon)