Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th
Fan Containment Ring with instrumentation. Installed in fatigue testing rig
Issued by: on
Fan Containment Ring with instrumentation. Installed in fatigue testing rig
NASA Identifier: C-2006-925
Date Taken: |
09.12.2009 |
Date Posted: |
02.08.2013 04:56 |
Photo ID: |
836299 |
Resolution: |
3600x2880 |
Size: |
6.2 MB |
Location: |
WASHINGTON, D.C., US |
Web Views: |
3 |
Downloads: |
2 |
PUBLIC DOMAIN
MORE LIKE THIS
CONTROLLED VOCABULARY KEYWORDS
TAGS