A graphic explaining how the Key Bridge Unified Command prepares to remove the bridge piece that lies atop the M/V Dali. This infographic also shows that the area covered by the established Safety Zone is also the area where hearing protection is required during the precision cutting on section 4 of the Francis Scott Key Bridge. A portion of Hawkins Point is included in this zone, and focused efforts will be made to ensure those in the area are prepared for the event. Removing the bridge section, in the fastest, safest, and most predictable means requires the use of precision cuts made by these small charges.
(Key Bridge Unified Command video by U.S. Army Corps of Engineers visual information specialist Christopher Rosario)