KITTERY, Maine (May 16, 2024) – The first of many 4,000-ton concrete monoliths arrived at Portsmouth Naval Shipyard (PNSY) in Kittery, Maine on May 16. The monolith arrived on a special barge from Cianbro Corporation Modular Manufacturing Facility in Brewer, Maine and are part of the Shipyard Infrastructure Optimization Program’s multi-mission Dry Dock #1 project, which is modernizing the World War II-era dry dock on PNSY. (U.S. Navy photo by Mass Communication Specialist 1st Class Charlotte C. Oliver/released)
Date Taken: | 05.16.2024 |
Date Posted: | 05.17.2024 10:55 |
Photo ID: | 8411712 |
VIRIN: | 240516-N-HV737-1001 |
Resolution: | 3000x2400 |
Size: | 2 MB |
Location: | KITTERY, MAINE, US |
Web Views: | 210 |
Downloads: | 2 |
This work, Concrete Monolith Arrives at Portsmouth Naval Shipyard [Image 6 of 6], by PO1 Charlotte Oliver, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.