The U.S. Army Engineer Research and Development Center (ERDC) has four notable military construction (MILCON) projects that have been approved for construction in 2024. Jack Wheeldon, ERDC’s chief of Installation Support Division, and Michael Harding, ERDC master planner, review the plans with an estimated construction cost of $43 million.
Date Taken: | 05.13.2024 |
Date Posted: | 05.28.2024 12:30 |
Photo ID: | 8426263 |
VIRIN: | 240513-A-HE363-5531 |
Resolution: | 4433x2955 |
Size: | 2.74 MB |
Location: | VICKSBURG, MISSISSIPPI, US |
Web Views: | 16 |
Downloads: | 2 |
This work, ERDC Unveils Strategic Vision and Cutting-Edge Projects for Infrastructure Enhancement and Sustainability, by Jared Eastman, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.