COLÓN, Panama (Aug. 19, 2024) U.S. Navy Builder 1st Class Alejandro Murga Altan, left, assigned to Naval Mobile Construction Battalion One, explains the plan for the repairs at Centro Reintegra in Colón, Panama as part of Continuing Promise 2024. Continuing Promise 2024 helps to strengthen the defense readiness of Caribbean and Latin American partners against malign threats in the region. (U.S. Navy photo by Mass Communication Specialist 2nd Class Adriones Johnson)
Date Taken: | 08.18.2024 |
Date Posted: | 08.19.2024 18:41 |
Photo ID: | 8599293 |
VIRIN: | 240819-N-NS135-1060 |
Resolution: | 6720x4480 |
Size: | 4.73 MB |
Location: | COLóN, PA |
Web Views: | 11 |
Downloads: | 1 |
This work, Seabees Work at Centro Reintegra [Image 8 of 8], by PO2 Adriones Johnson, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.